On Monday, the guys rolled out the plastic to cover the gravel. This is a moisture barrier.
And those bond beams I mentioned before... they had rebar laid into them.
I thought this was how it would be done, but wasn't 100% sure.
![]() |
| Add caption |
It's neat to see it all right now.
All that's missing is 4 inches of concrete poured on top.
And since we passed inspection, we're getting that concrete TODAY!
I can't wait for Little JCrew and Mr. Brigglesworth to see the trucks and pump. They loved it the last time when we poured the footers.
We are almost done with the foundation!